TM 5-4210-249-13&P-2
0291-2
DRAFT
0291
INSTALLATION
1.
Install two elbows (8) and (9) on foam system manual metering valve (4) (WP 0228).
2.
Install foam system manual metering valve (4) and two couplings (6) and (7) on vehicle (WP 0483).
NOTE
Install foam system manual metering valve as noted prior to removal.
3.
Install foam system manual metering valve (4) on bracket (5) with two cradles (3), U-bolts (2), and four
locknuts (1).
END OF TASK
FOLLOW-ON MAINTENANCE
Close pump operator’s panel housing (WP 0325)
END OF TASK
END OF WORK PACKAGE
TFFT00254