TM 5-4210-249-13&P-2
0289-1
DRAFT
0289
FIELD LEVEL MAINTENANCE
FOAM SYSTEM FLUSH VALVE REPLACEMENT
INITIAL SETUP:
REMOVAL
NOTE
•
Tag and mark air lines prior to removal to ensure proper installation.
•
Air lines remain attached to elbows.
1.
Remove two air lines (1) and (2) and elbows (3) and (4) from foam system flush valve (5).
2.
Remove two couplings (6) and (7) and foam system flush valve (5) from vehicle (WP 0483).
END OF TASK
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
- -
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
TFFT00081
Tools and Special Tools
Tool Kit, General Mechanic’s: Automotive
(WP 0622, Item 27)
Materials/Parts
Compound, Sealing, Pipe Thread
(WP 0625, Item 21)
Tags, Identification (WP 0625, Item 51)
References
WP 0483
WP 0615, Fig. 47
Equipment Conditions
Air system drained (TM 9-2320-347-10)
Water system drained (WP 0041)
Pump house panel A opened (WP 0539)