TM-5-4210-249-13-P-2

TACTICAL FIRE FIGHTING TRUCK (TFF) MODEL M1142

TECHNICAL MANUAL; OPERATOR’S AND FIELD LEVEL MAINTENANCE MANUAL WITH REPAIR PARTS AND SPECIAL TOOLS LIST (INCLUDING DEPOT REPAIR PARTS AND SPECIAL TOOLS); PART 2 OF 4

  TM-5-4210-249-13-P-2 - Page 970 of 1452

TM 5-4210-249-13&P-2
0209-4
DRAFT
0209
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
14. Loosen clamp (23) and remove hose (24) from valve (22).
15. Loosen clamp (25) and remove hose (24) from heater core (12).
END OF TASK
INSTALLATION
NOTE
•
Install cable ties as required.
•
Replacement hoses must be same length as removed hoses.
•
Turn shutoff valves counter-clockwise to open.
1.
Install hose (24) on heater core (12) with clamp (25).
2.
Install hose (24) on valve (22) with clamp (23).
TFFT00849


Back to Top