TM-5-4210-249-13-P-2

TACTICAL FIRE FIGHTING TRUCK (TFF) MODEL M1142

TECHNICAL MANUAL; OPERATOR’S AND FIELD LEVEL MAINTENANCE MANUAL WITH REPAIR PARTS AND SPECIAL TOOLS LIST (INCLUDING DEPOT REPAIR PARTS AND SPECIAL TOOLS); PART 2 OF 4

  TM-5-4210-249-13-P-2 - Page 970 of 1452

TM 5-4210-249-13&P-2
0209-4
DRAFT
0209
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
14. Loosen clamp (23) and remove hose (24) from valve (22).
15. Loosen clamp (25) and remove hose (24) from heater core (12).
END OF TASK
INSTALLATION
NOTE
Install cable ties as required.
Replacement hoses must be same length as removed hoses.
Turn shutoff valves counter-clockwise to open.
1.
Install hose (24) on heater core (12) with clamp (25).
2.
Install hose (24) on valve (22) with clamp (23).
TFFT00849


Back to Top