TM 5-4210-249-13&P-2
0209-6
DRAFT
0209
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
9.
Install hose (18) on hose (15).
10. Install split loom (17) on hose (15) with tape (16).
NOTE
Perform Step (11) to install heater hose on right side of engine.
11. Install hose (15) on shutoff valve (13) with clamp (14).
12. Open shutoff valve (13).
13. Install hose (10) on heater core (12) with clamp (11).
14. Install hose (10) on fitting (8) with clamp (9).
15. Install split loom (5) on hose (3).
TFFT00846
TFFT00845