TM-5-4210-249-13-P-3

TACTICAL FIRE FIGHTING TRUCK (TFF) MODEL M1142

TECHNICAL MANUAL; OPERATOR’S AND FIELD LEVEL MAINTENANCE MANUAL WITH REPAIR PARTS AND SPECIAL TOOLS LIST (INCLUDING DEPOT REPAIR PARTS AND SPECIAL TOOLS); PART 3 OF 4

FEBRUARY 2009

  TM-5-4210-249-13-P-3 - Page 1002 of 1488

TM 5-4210-249-13&P-3
0490-8
DRAFT
0490
SIDE DISCHARGE SYSTEM
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
NOTE
The following Steps may be necessary to access and replace side discharge system:
1.
Pump House Panel A Open/Close (WP 0539)
2.
Pump House Panels Replacement (WP 0540)
3.
Coupling Replacement (WP 0483)
4.
Piping Heat Trace Replacement (WP 0606)
5.
Piping Assembly (sealing compound) (WP 0489)
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
TFFT01869


Back to Top