TM 5-4210-249-13&P-3
0485-5/(6 blank)
DRAFT
0485
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
13. Install coupling (4) (WP 0483).
14. Tighten two locknuts (16).
15. Install hose (2) on elbow (3).
16. Connect connector (1).
END OF TASK
FOLLOW-ON MAINTENANCE
1.
Install flow sensor (WP 0390)
2.
Install pressure transducer (WP 0411)
3.
Install pump house panels A, D, E, and I (WP 0540)
END OF TASK
END OF WORK PACKAGE
TFFT0049