TM 5-5420-202-20-2
FUEL RETURN LINES REPLACEMENT (Sheet 1 of 10)
PROCEDURE INDEX
PROCEDURE
PAGE
Removal
7-52
Cleaning and Inspection
7-56
Installation
7-57
TOOLS: 7/16 in. combination box and open end wrench
1/2 in. combination box and open end wrench
9/16 in. combination box and open end wrench (two required)
3/4 in. combination box and open end wrench
7/8 in. combination box and open end wrench
15/1 6 in. combination box and open end wrench
3/8 in. socket with 3/8 in. drive
1/2 in. socket with 1/2 in. drive
11/1 6 in. socket with 1/2 in. drive
5 in. extension with 1/2 in. drive
1-1/8 in. open end wrench
Ratchet with 3/8 in. drive
Ratchet with 1/2 in. drive
Flat-tip screwdriver
Drip pan
Vise
SPECIAL TOOLS: Ground hop kit (Item 31, Chapter 3, Section I)
SUPPLIES:
Lockwasher
PRELIMINARY PROCEDURES:
Remove powerplant (page 5-2)
Remove cooling fans (page 9-55)
Remove engine access cover (left bank) (page 6-112)
Remove engine access cover (right bank) (page 6-107)
Go on to Sheet 2
7-52