TM 5-5420-202-20-2
POWERPLANT TESTS (GROUND HOP) (Sheet 2 of 16)
TOOLS:
1/2 in. combination box and open end wrench
9/16 in. combination box and open end wrench
3/4 in. combination box and open end wrench
Flat-tip screwdriver
Ratchet with 1/2 in. drive
Torque wrench with 1/2 in. drive (0-175 lb-ft) (0-237 NŽm)
1-1/4 in. socket with 1/2 in. drive
7/16 in. deepwell socket with 1/2 in. drive
SPECIAL TOOLS: Ground hop kit (Item 31, Chapter 3, Section
I)
Sleeve spacer (Item 2, Chapter 3, Section
I)
FABRICATED TOOLS:
Tachometer assembly (Fig. F-2, Appendix F)
Throttle linkage adjusting go/no-go gage (Fig. F-3, Appendix F)
PERSONNEL: Three
REFERENCES:
TM 5-5420-202-10
LO 5-5420-202-12
PRELIMINARY PROCEDURE:
Remove powerplant (page 5-2)
NOTE
Anyone complete powerplant test can be
performed separate from the other tests.
Powerplant tests need not be performed in
specific order. If more than one test is to be
performed, do not disconnect test hookup.
Disconnect test hookup only when test or
tests are complete.
Go onto Sheet 3
5-26
Change 3