RESERVOIR-TO-PUMP HOSE ASSEMBLY (CV5) REPLACEMENT (Sheet 1 of 3)
TOOLS:
7/8 in. open end wrench
1-1/8 in. open end wrench
1-7/16 in. open end wrench
1-3/4 in. open end wrench
12 in. adjustable wrench
SUPPLIES:
Pipe tape (Item 19, Appendix D)
Drip pans (suit able containers)
Rags (Item 12, Appendix D)
Masking tape (Item 18, Appendix D)
Pencil (Item 22, Appendix D)
REFERENCE:
LO 5-5420-202-12
PRELIMINARY PROCEDURE:
Drain hydraulic reservoir
REMOVAL:
NOTE
Use drip pan and rags to
fluid trapped in lines. Use
tag lines for installation.
catch hydraulic
masking tape to
(page
3-74)
1.
Using 7/8 inch wrench, disconnect hose
assembly “CV5” (A) from elbow (B).
2.
Using 1-1/8 inch wrench to hold bushing (C), use adjustable wrench to remove elbow
(B) and collar (D).
3.
Using 1-7/16 inch wrench to hold check valve (E), use 1-1/8 inch wrench to remove bushing
(c).
4.
Using 1-7/16 inch wrench, remove check valve (E).
5.
Using 1-3/4 inch wrench to hold bushing (F), use adjustable wrench to remove elbow
(G).
Go
on to Sheet
2
TA251590
3-194