TM-5-5420-228-24

LAUNCHER HYDRAULICS SYSTEM M48A5/M60A1 TANK CHASSIS, TRANSPORTING: FOR BRIDGE, ARMORED-VEHICLE-LAUNCHED; SCISSORING TYPE, CLASS 60

TECHNICAL MANUAL; ORGANIZATIONAL, DIRECT SUPPORT AND GENERAL SUPPORT; MAINTENANCE MANUAL

AUGUST 1985

  TM-5-5420-228-24 - Page 737 of 750

TM 5-5420-228-24
ALPHABETICAL INDEX - Continued
Subject, Page
O
- Continued
Overhead Cylinder Relief Valve (RV9)
Adjustment, 3-82
Installation, 3-112
Removal, 3-110
Overhead Cylinder Relief Valves (RV3 and RV9)
Cartridge
Installation, 3-80
Removal, 3-80
Overhead Cylinder Flow Regulator (PCV 1),
3-110
Overhead Cylinder Return Hose Assembly (F)
Installation, 3-164
Removal, 3-163
P
Periscope Mount
Cleaning and Inspection, 3-26
Installation, 3-26
Removal, 3-25
Periscope Mount Lid
Cleaning and Inspection, 3-29
Installation, 3-29
Removal, 3-28
Periscope Mount Retainer, 3-33
Periscope Stowage Boxes
Installation, 3-56
Removal, 3-56
PMCS, 2-4
Preliminary Servicing and Adjustment, 2-2
Principles of Operation, 1-3
Pump-Clutch Cover Plate
Installation, 3-65
Removal, 3-65
Pump-Clutch Drive
Installation, 4-25
Removal, 4-23
Subject, Page
P
- Continued
Pump-Clutch Support, 4-32
Pump Hydraulic
Assembly, 4-48
Cleaning and Inspection, 4-47
Disassembly, 4-43
Installation, 4-30
Removal, 4-29
Pump Relief Check Valve (CV5), 3-120
Pump-to-Valve Bank Hose Assembly (CW)
Installation, 3-190
Removal, 3-189
Purpose of Equipment, 1-1
Q
Quadrant
Installation
Front, 3-46
Left, 3-40
Right, 3-43
Removal
Front, 3-45
Left, 3-39
Right, 3-41
Quality Assurance/Quality Control, 1-1
R
Radio Installation Mount
Installation, 3-58
Removal, 3-57
Relief Valves
Adjustment
RV1, 3-76
RV2, 3-79
RV3, 3-81
RV4, 3-84
RV5, 3-86
RV6, 3-87
I-5


Back to Top