TM-5-5420-228-24

LAUNCHER HYDRAULICS SYSTEM M48A5/M60A1 TANK CHASSIS, TRANSPORTING: FOR BRIDGE, ARMORED-VEHICLE-LAUNCHED; SCISSORING TYPE, CLASS 60

TECHNICAL MANUAL; ORGANIZATIONAL, DIRECT SUPPORT AND GENERAL SUPPORT; MAINTENANCE MANUAL

AUGUST 1985

  TM-5-5420-228-24 - Page 739 of 750

TM 5-5420-228-24
ALPHABETICAL INDEX - Continued
Subject, Page
S
- Continued
Scissors Cylinder Relief Valve (RV8)-continued
Installation, 3-108
Removal, 3-106
Scissors Cylinder Relief Valve (RV8) Cartridge
Installation, 3-88
Removal, 3-88
Seat Assembly, Bridge, 3-49
Sequence and Locking Relief Valves (RV5
and RV6) Cartridge
Installation, 3-85
Removal, 3-85
Sequence Relief Valve (RV5)
Adjustment, 3-86
Installation, 3-104
Removal, 3-103
Sequence Valve (RV2)
Adjustment, 3-79
Sequence Valve (RV2) Cartridge
Installation, 3-78
Removal, 3-78
Sequence Valve Hose Assembly (AR)
Installation, 3-165
Removal, 3-165
Service-Upon Receipt, 2-2
Slave Hose, Hydraulic, 3-221
Smoke Grenade Discharger Wiring Harness
Assembly Replacement
Installation, 4-97
Removal, 4-96
Smoke Grenade Discharger Replacement
Installation, 4-99
Removal, 4-98
Subject, Page
S
- Continued
Smoke Grenade Discharger Bracket
Dummy Receptacle Replacement
Installation, 4-101
Removal, 4-100
Smoke Grenade Stowage Box
Replacement
Installation, 4-102
Removal, 4-102
Spare Head Stowage Boxes
Installation, 3-54
Removal, 3-54
Stowage Boxes, Periscope, 3-55
Switch, Blower Motor, 4-8
T
Tie Down Angle, 3-60
Tongue Assembly
Installation, 4-18
Removal, 4-16
Tongue Cylinder
Assembly, 4-80
Cleaning and Inspection, 4-79
Disassembly, 4-77
Installation, 3-237
Removal, 3-234
Tongue Cylinder Armor
Installation, 3-233
Removal, 3-232
Tongue Cylinder Check Valve (CV4), 3-99
Tongue Cylinder Flow
Tongue Cylinder Hose
CK2)
Installation, 3-137
Removal, 3-135
Regulator (PCV2), 3-114
Assemblies (CH, CK1, and
I-7


Back to Top