TM-5-5420-228-24

LAUNCHER HYDRAULICS SYSTEM M48A5/M60A1 TANK CHASSIS, TRANSPORTING: FOR BRIDGE, ARMORED-VEHICLE-LAUNCHED; SCISSORING TYPE, CLASS 60

TECHNICAL MANUAL; ORGANIZATIONAL, DIRECT SUPPORT AND GENERAL SUPPORT; MAINTENANCE MANUAL

AUGUST 1985

  TM-5-5420-228-24 - Page 80 of 750

TM 5-5420-228-24
STE/ICE
Test
Procedures
- Continued
-
PRESSURE
0-4000
PSIG
TEST
51.
This procedure
is to be performed
by
two
persons.
The
lead
person
is
referred
to as the first technician
and
shall direct
the activity
of the second
person
called
the second
technician.
Perform
VTM
GENERAL
SET
UP
(page
242)
and
CONFIDENCE
TEST
NO.
66
(page 2-44).
/
\
w
Connect
test
cables
and
pressure
transducer.
Do
OFFSET
test.
\
First
Technician
(Operator’s
Station)
If engaged,
disengage
hydraulic
clutch.
Relieve
hydraulic
pressure
(page
3-71).
Conned
P 1 of transducer
cable
W4
to J2 or J3 on
VTM.
Connect
P2 of transducer
cable
W4
adapter
MS3119E14-19.
Connect
P 1 of second
transducer
cable
W4
to
adapter
MS3119E14-19.
Seeond
Technician
(Relief
Valve
Being
Tested)
Place
suitable
container
under
relief
valve
to be
tested
(see page
2-49
for locator
views).
Remove
gage
plug
from
relief
valve.
Install
O-10,000
PSIG
transducer
(12258956)
in gage
port.
TA251344
2-47


Back to Top