TM-55-2350-215-10-15

TANK, COMBAT, FULL-TRACKED, M60-SERIES

TRANSPORTABILITY GUIDANCE

  TM-55-2350-215-10-15 - Page 25 of 66

TM 55-2350-215-10-15
(5)
For acceptable restraint, the vehicle
must be tied down in accordance with the pattern shown
in figure 4-1 and data given in table 4-1.
c.
Time Required.
Four men can prepare, load,
and tie down the vehicle in approximately 45 minutes.
d.
Unloading.
Three men can remove restraint
and unload the vehicle in approximately 15 minutes.
4-7.
Internal and External Transport by US Army
Aircraft
The M60-series tanks exceed the size and weight for
either internal or external transport by US Army fixed-
wing aircraft or rotary-wing helicopters.
4-2


Back to Top