TM-9-2320-209-10-1

2 1/2-TON, 6X6, M44A1 AND M44A2 SERIES TRUCKS (MULTIFUEL)

TECHNICAL MANUAL; OPERATION, INSTALLATION AND REFERENCE DATA; OPERATOR LEVEL

SEPTEMBER 1980

  TM-9-2320-209-10-1 - Page 365 of 549

TM 9-2320-209-10-1
4-15.
OPERATION OF EARTH BORING MACHINE AND POLESETTER TRUCKS.
a.
General. M764 earth boring machine and polesetter trucks are equipped with a
rear earth boring machine, rear winch, and collapsible cable reel. The rear winch is
used with the earth boring machine derrick to set and pull poles, and with collapsible
cable reel to take up or lay wire and light cable.
b. Preparing the Truck for Boring Operation.
1.
Start engine. (Refer to para 4-6b.)
2.
Place truck so rack bar (1) will be directly over hole location when in boring
position.
3.
Press clutch pedal (2) down.
4.
Place FRONT TRANSMISSION gear shift lever (3) in N position. Let clutch
pedal (2) up slowly.
5.
Pull handbrake (4) up to on position.
6.
Take wheel chocks (5) from side of truck and place them against rear wheels.
GO TO FRAME 2
4-311


Back to Top