TM-9-2320-209-20-3-3

2½-TON, 6X6, M44A1 AND M44A2 SERIES TRUCKS (MULTIFUEL)

TECHNICAL MANUAL; TROUBLESHOOTING; ORGANIZATIONAL LEVEL; VOLUME 3 OF 3; PART 3 OF 4

MAY 1981

  TM-9-2320-209-20-3-3 - Page 87 of 548

TM
9-2320-209-20-3-3
FRAME 3
1.
Put cable (1) on valve lever (2) so it will be held by U-bolt (3). Put U-bolt
through holes in valve lever.
2.
Put plate (4) onto U-bolt (3). Start two nuts (5) onto U-bolt.
3.
Using pliers, pull cable (1) through U-bolt (3) to take out most of the slack.
While holding cable, using 7/16-inch wrench, tighten two nuts (5).
END OF TASK
18-72


Back to Top