TM-9-2320-209-20-3-4

2½-TON, 6X6, M44A1 AND M44A2 SERIES TRUCKS (MULTIFUEL)

TECHNICAL MANUAL; TROUBLESHOOTING; ORGANIZATIONAL LEVEL; VOLUME 3 OF 3; PART 4 OF 4

MAY 1981

  TM-9-2320-209-20-3-4 - Page 346 of 410

TM 9-2320-209-20-3-4
FRAME 2
1.
2.
3.
4.
5.
6.
Put pressurization valve hand control assembly cable housing (1) in clamp
(2) and control cable (3) in two swivels (4).
Push swivels (4) all the way toward firewall (5).
Slide pressurization valve hand control assembly cable housing (1) in clamp
(2) so there is no less than 1/2 inch between swivels (4) and pressurization
valve hand control assembly cable housing (1).
Using wrenches, tighten capscrew and nut (6). Push swivels (4) all the
way away from firewall (5).
Using screwdriver, tighten two setscrews (7).
From inside cab, move pressurization valve hand control knob (8) out and
in several times to make sure all parts move smoothly without binding.
NOTE
Follow-on Maintenance Action Required:
Close hood. Refer to TM 9-2320-209-10.
END OF TASK
23-119


Back to Top