frame 4
TM 9-2320-209-34-2-1
1.
2.
3.
4.
5.
6.
GO
Takeout four screws (1) and washers (2).
Takeoff timing cover (3) and gasket (4).
Hold nut (5) in place.
Look in timing window (6). Check that timing mark (7) is alined with
pointer (8).
If mark (7) is not alined with pointer (8), turn nut (5) until mark and
pointer aline.
Tighten three screws (9) to 23 to 27 pound-feet. Make sure that drive
gear (10) does not turn while screws are being tightened.
TO FRAME 5
2-166