TM 9-2320-209-34-2-2
FRAME 3
1.
2.
3.
4.
GO
Put on trip cam (1).
Tighten setscrew (2).
Put on bearing sleeve (3) and lever (4).
Put on bracket (5).
Put on fusible link (6) and cotter pin (7). Put on fisible link release
lever (8) and cotter pin (9).
Do step 1 for other lever.
TO FRAME 4
17-215