TM 9-2320-209-34-2-2
c.
Cleaning. Clean hold down slats and
Let parts air dry.
d.
Inspection and Repair.
FRAME 1
floorboards with soapy water and rags.
1.
Check that 13 floorboards (1) are not split, rolled or worn. If floorboards
are damaged, get new ones.
2.
Check that eight hold down slats (2) are not cracked, bent or dented. If
hold down slats are damaged, get new ones.
3.
Paint parts as needed. Refer to TM 43-0139.
END OF TASK
17-749