TM-9-2320-260-20

TRUCK, 5-TON, 6X6, M809 SERIES (DIESEL)

TECHNICAL MANUAL; UNIT MAINTENANCE

APRIL 1995

  TM-9-2320-260-20 - Page 1057 of 1337

TM 9-2320-260-20
13-35. WRECKER HYDRAULIC PRESSURE TEST AND ADJUSTMENT
THIS TASK COVERS:
a. Testing
b. Adjustment
INITIAL SETUP
APPLICABLE MODELS
EQUIPMENT CONDITION
M816
Parking brake set (TM 9-2320-260-10).
REFERENCES (TM)
Boom fully retracted (TM 9-2320-260-10).
TM 9-2320-260-10
TM 9-2320-260-20P
1. Remove plug (6) from elbow (7).
2. Install hydraulic pressure gage fitting (5) on elbow (7).
3. Start engine (TM 9-2320-260-10).
4. Lower cable hook (1) enough to provide travel for pressure testing hydraulic system.
5. Hold boom crowd control lever (4) in retracted position and hoist control lever (3) in up position.
Record reading on hydraulic pressure gage (2).
6. Reading on hydraulic pressure gage (2) should be 1200 psi (8274 kpa). If reading is not 1200 psi
(8274 kpa), adjustment is required.
CAUTION
Never adjust relief valve without using pressure gage. Equipment
failure will occur.
1. Remove capnut (11) from relief valve (8) and loosen nut (9).
2. Turn setscrew (10) clockwise to increase hydraulic pressure, or counterclockwise to decrease
hydraulic pressure.
3. Hold setscrew (10) and tighten nut (9) on relief valve (8).
4. Install capnut (11) on relief valve (8).
5. Retest hydraulic pressure system.
13-84


Back to Top