TM 9-2320-260-20
13-42. HOIST WINCH CABLE REPLACEMENT (M816, M819)
THIS TASK COVERS:
a. Removal
b. Installation
INITIAL SETUP
APPLICABLE MODELS
REFERENCES (TM)
M816, M819
TM 9-2320-260-10
MATERIALS/PARTS
Four lockwashers
TM 9-2320-260-20P
EQUIPMENT CONDITION
Two locknuts
●
Parking brake set (TM 9-2320-260-10).
PERSONNEL REQUIRED
●
Wrecker hoist winch block removed (para. 13-39).
Two
GENERAL SAFETY INSTRUCTIONS
Wear hand protection when handling winch cable.
WARNIN G
Wear hand protection when handling winch cable. Broken wires
may cause injury to personnel.
NOT E
Maintain manual tension on hoist cable.
1. Remove four screws (7), lockwashers (6), washers (5), and guard (4) from rear sheaves (8). Discard
lockwashers (6).
2. Remove two locknuts (2), screws (11), and spacers (1) from inner boom (10). Discard locknuts (2).
3. Remove setscrew (12) and cable (9) from hoist winch drum (13).
4. Firmly grasp cable (9) and remove cable (9) from boom (3),
1. Guide and position cable (9) on boom (3) and rear sheaves (8).
2. Install cable (9) on hoist winch drum (13) with setscrew (12).
3. Install two spacers (1) on inner boom (10) with two screws (11) and new locknuts (2).
4. Install guard (4) on boom (3) with four washers (5), new lockwashers (6), and screws (7).
13-96