TM-9-2320-260-20

TRUCK, 5-TON, 6X6, M809 SERIES (DIESEL)

TECHNICAL MANUAL; UNIT MAINTENANCE

APRIL 1995

  TM-9-2320-260-20 - Page 934 of 1337

TM 9-2320-260-20
12-45. CEILING LIGHT FIXTURES MAINTENANCE
(Contd)
f. Ceiling Light Fixture Installation
1. Connect two wires (22) to two wires (24) with two new insulated wire splices (23).
2. Install center ceiling light fixture (25) in ceiling (20) with four screws (26).
FOLLOW-ON TASKS: • Connect battery ground cable (para. 4-48).
• Install fluorescent lights (para. 12-42).
• Install ceiling lights (TM 9-2320-260-10).
12-97


Back to Top