TM 9-2320-260-34-1
9-4. TRANSFER REPAIR (Contd)
119. Move shifter fork (7) under screw (8) and turn screw (8) until clearance between head of
screw (8) and shifter fork (7) is 0.006-0.010 in. (0. 15-0.25 mm). Install setscrew (6) in bore (9) and
tighten 5-15 lb-ft (7-20 N
•
m).
120. Coat contact surfaces of new gasket (4) with sealing compound and position gasket on housing (5).
121. Install gasket (4) and cover (3) on housing (5) with four new lockwashers (2) and screws (1). Tighten
—
screws (1) 20-35 lb-ft (27-48 N
•
m).
9-56