TM-9-2320-260-34-2

TRUCK, 5-TON, 6X6, M809 SERIES (DIESEL)

TECHNICAL MANUAL; DIRECT SUPPORT AND GENERAL SUPPORT MAINTENANCE; VOLUME 2 OF 2

JULY 1994

  TM-9-2320-260-34-2 - Page 107 of 863

TM 9-2320-260-34-2
15-15. HOIST CYLINDER MAINTENANCE (Contd)
1.
Attach two chains to hoist cylinder (2) and lifting device.
WARNING
All personnel must stand clear during lifting operations.
A swinging or shifting load may cause injury to personnel.
Ensure lifting capacity is greater than weight (500 lb (227 kg)) of
hoist cylinder. Failure to do so may result in injury to personnel
or damage to equipment.
2. Raise hoist cylinder (2) from supports and position on sub frame (5).
3.
Install hoist cylinder (2) on subframe (5) with two bearing caps (4), four new lockwashers (3),
and screws (1).
15-46


Back to Top