TM 9-2320-260-34-2
16-21. BOOM REPAIR (M816) (Contd)
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
WARNING
●
All personnel must stand clear during lifting operations.
A swinging or shifting load may cause injury to personnel.
●
Ensure lifting capacity is greater than weight (400 lb (182 kg))
of hoist winch. Failure to do so may result in injury to personnel
or damage to equipment.
NOTE
Assistant will help with steps 5 and 6.
Install chain and lifting device on hoist winch (3).
Install hoist winch (3) on boom (5) with twelve new lockwashers (16) and screws (17).
Connect two lines (15) to hoist winch motor (2).
NOTE
●
All hanger rollers are installed the same way. This procedure
covers rear hanger rollers.
Apply a light coat of GM grease to all shafts and bushings of
rollers prior to installation.
Install roller (23) on shaft (22).
Install hanger (21) on each end of shaft (23) level wind roller (22) and bracket
(14) with
four new
locknuts (26) and screws (25).
Install shaft (23) and level wind rollers (22) on brackets (14) with new cotter Pin (20).
Wrap male threads on grease fitting (24) with antiseize tape.
Install grease fitting (24) in shaft (23).
NOTE
●
Upper and lower boom rollers are installed the same way. This
procedure covers upper boom rollers.
●
Assistant will help with step 13.
Install upper boom roller (4) on boom (5) with six new Iockwashers (18) and screws (19).
Install floodlight (28) on boom (5) with two washers (27) and nuts (29).
FOLLOW-ON TASKS: Install inner boom (para.
16-19).
16-129