TM-9-2320-260-34-2

TRUCK, 5-TON, 6X6, M809 SERIES (DIESEL)

TECHNICAL MANUAL; DIRECT SUPPORT AND GENERAL SUPPORT MAINTENANCE; VOLUME 2 OF 2

JULY 1994

  TM-9-2320-260-34-2 - Page 738 of 863

17-15. PERSONNEL HEATER FLAME DETECTOR SWITCH MAINTENANCE
THIS TASK COVERS:
a. Removal
d. Assembly
b. Disassembly
e. Installation
c. Cleaning and Inspection
INITIAL SETUP
APPLICABLE MODELS
MATERIALS/PARTS
All
Five screw-assembled lockwashers
TEST EQUIPMENT
(Appendix D, Item 402)
Sleeve (Appendix D, Item 507)
Multimeter (Appendix
B, Item 115)
REFERENCES (TM)
TOOLS
TM 9-2320-260-20
General mechanic’s tool kit
(Appendix B, Item 1)
TM 9-2320-260-34P-2
Tool kit, electrical (Appendix B, Item 106)
EQUIPMENT CONDITION
Personnel heater removed (TM 9-2320-260-20).
The flame detector switch is maintained the same for early and
late model heaters.
• Tag all wires for installation.
a.Removal
1. Release two dzus fasteners (6) and remove guard (5) from heater housing (7).
2. Remove five screw-assembled lockwashers (l), two ignition control leads (4), receptacle leads (3), and
blower motor lead (2) from flame detector switch (9). Discard screw-assembled lockwashers (1).
3. Loosen nut (8) and remove flame detector switch (9) from heater housing (7).
17-37
TM 9-2320-260-34-2


Back to Top