TM-9-2320-272-10

TRUCK, 5-TON, 6X6, M939, M939A1, AND M939A2 SERIES TRUCKS (DIESEL)

TECHNICAL MANUAL; OPERATOR'S MANUAL

SEPTEMBER 2004
CHANGE 2

  TM-9-2320-272-10 - Page 198 of 481

2-97
Table 2-3. Preventive Maintenance Checks and Services for Models M939/A1/A2 (Contd).
ITEM
NO.
INTERVAL
ITEM TO
CHECK/
SERVICE
NOT FULLY
MISSION
CAPABLE IF:
TM 9-2320-272-10
LOCATION
CREWMEMBER
PROCEDURE
82
83
Monthly
Monthly
Surge
Tank
Wrecker
Boom
DRIVER
WARNING
If temperature gauge reads
above 175° F (79° C), use care
when removing surge tank
filler cap. Pressurized steam
or hot coolant will cause injury
to personnel.
a.
Check all hoses (4) for deterio-
ration and/or leakage. Tighten
loose or leaking hose connections.
DRIVER
Check the date of the last boom
load test. If more than one-year-
old, notify unit maintenance (refer
to TB 9-352).
Class III leakage
is evident, or
hoses (4) are cut
or broken.
Load test is more
than one year old.


Back to Top