TM 9-2320-272-10
2-130
(12)
Release level wind (1) by pulling out lock
knob (2), rotating it 90 degrees, and releasing knob (2).
(13)
Turn on floodlights (5) for night operation if
tactical situation permits.
NOTE
Torque control lever must be in HIGH or LOW
before directional control lever can be operated.
(14)
Remove travel pin (8) and pull
torque control lever (7) outward to HIGH.
.
WARNING
.
Wear hand protection when handling winch
cable. Do not handle cable with bare hands.
Broken wires may result in injury.
NOTE
Cable and snatch block ratings on level surface
are 14,500 lb (6,583 kg) for 3/4 in. (19 mm) cable;
22,500 lb (10,215 kg) for single sheave snatch
block; 27,500 lb (12,485 kg) for double-sheave
snatch block.
(15)
To unwind winch cable:
(a)
Release cable tensioner switch (9) if
engaged.
(b)
Remove travel pin (8) and pull direc-
tional control lever (6) outward to UNWIND until
winch cable hook and
chain (3) are loosened from bumperettes (4).
(c)
Direct crewmember to free cable hook
and chain (3) from rear bumperettes (4).
(d)
With crewmember maintaining manu-
al tension on cable, pull directional control lever (6)
outward to UNWIND.
(e)
After required length of
cable (14) has been unwound, return directional con-
trol lever (6) to NEUTRAL.
2-24. OPERATION OF MEDIUM WRECKER (Contd)