TM 9-2320-272-10
2-24. OPERATION OF MEDIUM WRECKER (Contd)
2-137
(12)
To lift and swing load:
NOTE
This operation requires use of all outriggers.
(a)
Perform steps 1 through 9.
(b)
Slightly pull boom control lever (6) back to UP to take boom (1)
weight off shipper braces (12).
(c)
Remove retaining clips (16)
from L-shaped shipper brace retaining
pins (14) and remove pins (14) from shipper
brace brackets (13).
(d)
Swing brace (12) upward to
brace retaining brackets (10) on each side of
shipper (11). Secure braces (12) on
brackets (10) with retaining clips (15).
CAUTION
When extending boom, move HOIST
and CROWD levers at the same time.
Failure to do so may result in boom
damage.
(e)
Extend boom (1) as necessary
by pushing crowd control lever (8) forward to
DOWN. Maintain an even distance between
crane block (3) and boom sheaves (2).
(f)
Elevate boom (1) to desired
height by pulling boom control lever (6) back
to UP.
(g)
Lift load (5). Refer to step 10.
CAUTION
Boom rotates 360°. Make sure area is
clear of obstacles, and caution is used
when operating boom over cab area.
Damage to windshield, exhaust stack,
air intake, and cab may result.
(h)
Push swing control lever (9) forward to LEFT to swing load (5) left.
Pull swing control lever (9) back to RIGHT to swing load (5) right.
(i)
Lower load. Refer to step 11.