TM-9-2320-272-10

TRUCK, 5-TON, 6X6, M939, M939A1, AND M939A2 SERIES TRUCKS (DIESEL)

TECHNICAL MANUAL; OPERATOR'S MANUAL

SEPTEMBER 2004
CHANGE 2

  TM-9-2320-272-10 - Page 245 of 481

TM 9-2320-272-10
2-144
2-24. OPERATION OF MEDIUM WRECKER (Contd)
f.
Securing Crane After Operation.
(1)
Secure outriggers (4), two boom
jacks (3), tie bar (6), and boom jack base plates (5).
Refer to step d.
NOTE
When retracting boom, pull
crowd control lever back to
RETRACT and hoist control lever
back to UP to prevent block from
becoming tangled.
(2)
Fully retract boom (1) into shipper (2) and
center boom (1) to rear of wrecker.
(3)
Remove retaining clip (11) from upper
retaining brackets (7) and swing shipper braces (8) to
shipper brace brackets (9) on wrecker body. Secure
shipper braces (8) in place with L-shaped retaining
pins (10) and retaining clip (12).
(4)
Push boom control lever (17) forward to
DOWN to allow shipper braces (8) to support boom
(1) and weight of shipper (2).
(5)
Install lifting sling (15) onto crane block
hook (14). Attach hook ends of sling (15) to brackets
(16) on outrigger (4).
(6)
Pull hoist control lever (18) back to UP
and remove all slack from lifting sling (15) and boom
cable (13).


Back to Top