TM 9-2320-272-10
2-24. OPERATION OF MEDIUM WRECKER (Contd)
2-140
(n)
Install boom jack (1) in base plate (3) and secure in place with
retaining pin (7) and retaining clip (8).
(o)
Obtain tie bar (2) from wrecker bed and install between boom
jacks (1). Secure in place with retaining pin (5) and retaining clip (6).
(p)
Push boom control lever (9) to DOWN position, and release it when
boom jacks (1) make firm contact with ground.
(q)
Perform lifting and lowering operation. Refer to steps 10 and 11.
(14)
Heavy side lifts are similar to heavy rear lifts except that front and rear
outriggers (4) from the lifting side of the vehicle will be positioned.
e.
Towing With Wrecker Crane.
.
WARNING
.
• If vehicle being towed has inoperative compressed air system,
emergency air and service air lines must not be connected
between vehicles. Failure to do this may result in damage to
equipment, or cause injury or death.
• If the compressed air system of the vehicle being towed has
emergency air and service air lines, they must not be connected.
CAUTION
• Do not use towing as a means to start engine of vehicle with
automatic transmission. Refer to disabled vehicle operator’s
manual for towing instruction. Failure to so may will result
in damage to vehicle.
• Maximum towing speed shall not exceed 35 mph (56 km/h) on
paved highway or 15 mph (24 km/h) on off-highway surfaces.
NOTE
When towing M939/A1/A2 series vehicles with inoperative
compressed air system, the spring brakes must be caged.