TM-9-2320-272-10

TRUCK, 5-TON, 6X6, M939, M939A1, AND M939A2 SERIES TRUCKS (DIESEL)

TECHNICAL MANUAL; OPERATOR'S MANUAL

SEPTEMBER 2004
CHANGE 2

  TM-9-2320-272-10 - Page 303 of 481

TM 9-2320-272-10
2-194
a.
General.
This paragraph provides information for personnel processing vehi-
cles for shipment. Most tasks associated with shipment may have been performed by
unit maintenance prior to delivery. If this vehicle is to be transported to a loading site,
the following preparation may be necessary
b.
Tools and Special Requirements.
Except for spare tire removal (para. 3-11),
the organization responsible for processing will provide tools and containers for
stowage. Stowage of parts removed will be on vehicles or in suitable containers as
specified by contracting agent. Exposed exhaust and intake pipes must be covered
when vehicles are not running.
c.
Minimum Reducible Height.
(1)
On the M923/A1/A2, M925/A1/A2, M927/A1/A2, and M928/A1/A2 cargo
trucks, the minimum reducible height is referenced on data plate located on right
side of instrument panel (para. 2-28). All portions of the vehicle above this point
must be removed or lowered. These may include any or all of the following:
Rear view mirrors (task d.).
Windshield (para. 2-21).
Cab top (para. 2-21). For hard cab tops, refer to unit maintenance.
Air intake extension (task f.).
Davit and boom (task g.).
Exhaust pipe extension (task e.).
Spare tire (M923A1/A2, M925A1/A2, M927A1/A2, M928A1/A2) (para. 3-11).
Tarpaulin and bow kit (para. 2-42). Stow flat on bed of truck.
Side and front racks (M927/A1/A2 and M928/A1/A2) (para. 2-23).
2-29. PREPARATION FOR SHIPMENT
A
B
C
D
E
F
G
H
I


Back to Top