REMOVAL
1.
Loosen retaining pin (Figure 1, Item 2) and remove boom extension (Figure 1, Item 1) from boom
(Figure 1, Item 3).
2.
Loosen screw (Figure 1, Item 4) and remove boom (Figure 1, Item 3) from boom support (Figure 1, Item 5).
3.
Remove two locknuts (Figure 1, Items 8 and 11) and screws (Figure 1, Items 6 and 12) from frame rail brackets
(Figure 1, Items 9 and 10) and carrier base (Figure 1, Item 7). Discard locknuts.
4.
Remove carrier base (Figure 1, Item 7) from frame rail brackets (Figure 1, Items 9 and 10).
TM 9-2320-272-23-3
0522