FIELD MAINTENANCE
TRANSFER CASE REPLACEMENT (ALL EXCEPT M936/A1/A2)
INITIAL SETUP:
Tools and Special Tools
Tool Kit, General Mechanic's: Automotive
(Volume 5, WP
0826, Table 1, Item 56)
Jack Dolly Type Hydraulic
(Volume 5, WP
0826, Table 1, Item 32)
Lift, Transmission and Differential
(Volume 5, WP
0826, Table 1, Item 33)
Lifting Device
Wrench, Torque, Click, Ratcheting, 1/2" Drive,
250 Ft-Lb
(Volume 5, WP
0826, Table 1, Item 63)
Materials/Parts
Tape, Antiseizing
(Volume 5, WP
0825, Table 1, Item 65)
Locknut (Volume 5, WP
0827, Table 1, Item 206)
Qty:
1
Locknut (Volume 5, WP
0827, Table 1, Item 279)
Qty:
10
Locknut (Volume 5, WP
0827, Table 1, Item 285)
Qty:
10
Lockwasher
(Volume 5, WP
0827, Table 1, Item 445)
Qty:
4
Personnel Required
(2)
References
Volume 5, WP
0820
Equipment Condition
Parking brake set. (TM 9-2320-272-10)
Transfer case oil drained. (Volume 5, WP
0820)
Wet reservoir removed. (WP
0451)
Transfer case-to-forward rear axle propeller shaft
removed. (WP
0402)
Spare tire removed (M923/A1/A2, M925/A1/A2,
M929/A1/A2, and M930/A1/A2).
(TM
9-2320-272-10)
Transfer case interlock valve removed.
(WP
0394)
Transfer case front axle engagement control valve
removed. (WP
0388)
Transfer case shift rod removed.
(WP
0396)
TM 9-2320-272-23-3
0385
0385-1