INSTALLATION
WARNING
•
Assistant must remain at crane controls until removal operation is completed. Injury to
personnel may result if boom control lever is accidentally engaged while work is being
done between raised boom and swivel base. Failure to comply may result in injury or
death to personnel.
•
All personnel must stand clear during hoisting operations. A snapped cable, or swinging
or shifting load, may occur. Failure to comply may result in injury or death to personnel.
1.
Raise boom (Figure 2, Item 1) to a 45-degree position.
2.
Spread out crane harness (Figure 2, Item 7) on vehicle along general lines of installation.
3.
Thread gondola floodlight wire (Figure 2, Item 21) through side plate (Figure 2, Item 15) and connect leads
(Figure 2, Item 13) to floodlight (Figure 2, Item 12).
4.
Connect crane harness leads (Figure 2, Item 20) to swivel leads (Figure 2, Item 19).
5.
Connect crane harness leads (Figure 2, Item 16) to floodlight wire leads (Figure 2, Item 2).
6.
Thread oil reservoir floodlight wire (Figure 2, Item 17) through side plate (Figure 2, Item 6) and connect leads
(Figure 2, Item 4) to oil reservoir floodlight (Figure 2, Item 5).
7.
Install oil reservoir floodlight wire (Figure 2, Item 17) on side plate (Figure 2, Item 6) with three clamps
(Figure
2, Item 18) and screws (Figure 2, Item 3).
8.
Install crane harness (Figure 2, Item 7) on turntable (Figure 2, Item 9) and side plates
(Figure 2, Items 6 and 15) with six clamps (Figure 2, Item 10) and screws (Figure 2, Item 8).
9.
Install gondola floodlight wire (Figure 2, Item 21) on gondola (Figure 2, Item 11) with three clamps
(Figure
2,
Item 14) and screws (Figure 2, Item 22).
10.
Lower boom (Figure 2, Item 1) (TM 9-2320-272-10).
TM 9-2320-272-23-3
0355
0355-4