FOLLOW-ON MAINTENANCE
1.
Install ceiling air ducts.
2.
Install ceiling filler and side panels.
3.
Install clearance and blackout marker lights. (WP
0644)
4.
Install rear wall interior panels.
5.
Connect battery ground cables. (Volume 2, WP
0350)
6.
Main power switch on. (TM 9-2320-272-10)
END OF TASK
END OF WORK PACKAGE
TM 9-2320-272-23-4
0659
0659-6