TM-9-2320-272-23-4

TRUCK, 5-TON, 6X6, M939, M939A1, AND M939A2 SERIES TRUCKS (DIESEL)

TECHNICAL MANUAL; FIELD MAINTENANCE MANUAL; VOLUME 4 OF 5

SEPTEMBER 2012

  TM-9-2320-272-23-4 - Page 669 of 1393

INSTALLATION
1.
Position wiring harness (Figure 2, Item 2) on van body (Figure 2, Item 4).
2.
Install wiring harness (Figure 2, Item 2) on van ceiling (Figure 2, Item 14) with 12 clamps (Figure 2, Item 15)
and screws (Figure 2, Item 16).
3.
Install three wires (Figure 2, Item 11) on circuit breakers (Figure 2, Item 9) with three screws
(Figure
2,
Item
10).
4.
Install wire (Figure 2, Item 6) on neutral bus (Figure 2, Item 7) with screw (Figure 2, Item 8).
5.
Install clamp (Figure 2, Item 13) on wiring harness (Figure 2, Item 2) and van body (Figure 2, Item 4) with screw
(Figure 2, Item 3).
6.
Install cover (Figure 2, Item 12) on load center (Figure 2, Item 5) with six screws (Figure 2, Item 1).
TM 9-2320-272-23-4
0663
0663-4