REMOVAL
NOTE
Tag wires for installation.
1.
Remove six screws (Figure 1, Item 1) and cover (Figure 1, Item 12) from load center (Figure 1, Item 5).
2.
Remove screw (Figure 1, Item 3) and clamp (Figure 1, Item 13) from wiring harness (Figure 1, Item 2) and van
body (Figure 1, Item 4).
3.
Remove screw (Figure 1, Item 8) and wire (Figure 1, Item 6) from neutral bus (Figure 1, Item 7).
4.
Remove three screws (Figure 1, Item 10) and wires (Figure 1, Item 11) from circuit breakers
(Figure
1,
Item
9).
5.
Remove 12 screws (Figure 1, Item 16) and clamps (Figure 1, Item 15) from van ceiling (Figure 1, Item 14) and
wiring harness (Figure 1, Item 2).
6.
Remove wiring harness (Figure 1, Item 2) from van body (Figure 1, Item 4).
TM 9-2320-272-23-4
0663
0663-2