FOLLOW-ON MAINTENANCE
1.
Install gondola. (WP
0699)
2.
Install crane swing gearcase. (WP
0691)
3.
Install hydraulic swivel valve. (WP
0689)
4.
Install boom elevating cylinders. (WP
0693)
5.
Lubricate gear bearing. (Volume 5, WP
0820)
6.
Install hydraulic oil reservoir. (WP
0703)
END OF TASK
END OF WORK PACKAGE
TM 9-2320-272-23-4
0692
0692-8