INSTALLATION - Continued
M6063DAA
1
2
3
6
7
8
10
11
12
4
5
9
13
14
Figure 2.
Boom Elevating Cylinder Installation.
END OF TASK
FOLLOW-ON MAINTENANCE
1.
Fill hydraulic oil reservoir to proper level. (TM 9-2320-272-10)
2.
Operate crane through full elevating range and check for leaks at oil lines and cylinder. (TM 9-2320-272-10)
END OF TASK
END OF WORK PACKAGE
TM 9-2320-272-23-4
0693
0693-5/6 blank