REMOVAL
1.
Position chain around hoist winch (Figure 1, Item 6) and attach to lifting device. Take up tension in chain.
WARNING
•
All personnel must stand clear during lifting operations. A swinging or shifting load may
occur. Failure to comply may result in injury or death to personnel.
•
Ensure lifting capacity is greater than weight (400 lb (182 kg)) of hoist winch. Failure to
comply may result in damage to equipment, injury, or death to personnel.
NOTE
Assistant will help with Steps (2) and (3).
2.
Remove 12 screws (Figure 1, Item 5), lockwashers (Figure 1, Item 4), and hoist winch (Figure 1, Item 6) from
boom (Figure 1, Item 1). Discard lockwashers.
3.
Lower hoist winch (Figure 1, Item 6) from boom (Figure 1, Item 1) and remove hoist winch from vehicle.
4.
Remove lifting device (Figure 1, Item 2) and chain (Figure 1, Item 3) from hoist winch (Figure 1, Item 6).
TM 9-2320-272-23-4
0696
0696-2