3-62. SURGE
TM 9-2320-272-24-1
7.
Install fitting (4) on surge tank (3).
8.
Connect hose (13) to fitting (4) and tighten clamp (12).
9.
Connect hose (11) to surge tank (3).
FOLLOW-ON TASKS: • Install exhaust pipe (para. 3-50).
• Fill cooling system to proper level (para. 3-53).
• Start engine (TM 9-2320-272-10) and check for coolant leaks.
3-185