3-413. AIR
TM 9-2320-272-24-2
FOLLOW-ON TASKS: • Connect battery ground cables (para. 3-126).
• Install fifth wheel deck plate (M931/A1/A2, M932/A1/A2 only) (para. 3-251).
• Start engine, allow air system to reach normal operating pressure, and check air
system for leaks (TM 9-2320-272-10).
3-1045