4-4. POWER PLANT (M939/A1) REPLACEMENT (Contd)
17.
Connect breather vent line (3) to transmission adapter elbow (2).
18.
Install transmission shift cable (19) and cable pin (20) on shift lever (22) with new cotter pin (21).
Install transmission shift cable (19) on support bracket (15) with shim (17), U-bolt (18), and two
new locknuts (16).
19.
Install bracket (7), new O-ring (9), and modulator (10) on transmission (1) with screw (8).
20.
Install bracket (5), and modulator cable (11) with clamp (14) and speedometer cable (12) with
clamp (14) on transmission (1) with screws (6) and (13) and nut (4).
NOTE
Step 21 applies only to vehicles equipped with a transmission
PTO.
Transmission connections listed in steps 21 through 24 can be
made through access door in cab floor.
21.
Install PTO cable (29) and cable pin (30) on select lever (31) with washer (32) and new cotter
pin (23), and PTO cable (29) on bracket (25) with spacer plate (26), retaining strap (27), two
screws (28), and nuts (24).
22.
Install transmission oil dipstick (37) in dipstick tube (36).
23.
Install wires (33) and (35) in two spring tension clips (34).
24.
Connect wire (33) to transmission oil temperature sending unit (38).