TM 9-2320-272-24-3
4-161. ELECTRICAL LOAD CENTER BOX MAINTENANCE (Contd)
d. Installation
1.
Install load center (3) on van body (4) and conduit (5) with four washers (2), screws (1), and
special nut (6).
2.
Install left 3-phase receptacle wiring harness (8) and three wires (13) in load center (3) and on triple
circuit breaker (11) with three screws (12).
3.
Install wire (9) on neutral buss bar (10) with screw (7).
4-784