Table 1. Preventive Maintenance Checks and Services (PMCS) - Continued.
ITEM
NO.
INTERVAL
ITEM TO BE
CHECKED OR
SERVICED
PROCEDURE
EQUIPMENT NOT
READY/AVAILABLE
IF:
OUTSIDE OF
CAB LEFT
SIDE
67
Weekly
A/C
Receiver/Dryer
Unit
a. Inspect receiver/dryer
(Figure 30, Item 3)
for damage and loose
or missing mounting
hardware.
Receiver/dryer
unit is damaged
or has loose or
missing
mounting
hardware and
A/C is required
for mission.
b. Inspect receiver/dryer
(Figure 30, Item 3)
for leaks. Leaks can
be identified by oil
residue on A/C hoses
and hose fittings
(Figure 30, Item 1).
Leaks are
evident and A/C
is required for
mission.
c. Inspect A/C hoses
and hose fittings
(Figure 30, Item 1)
and electrical harness
(Figure 30, Item 2)
for damage and loose
or missing mounting
hardware.
A/C hoses and
hose fittings or
electrical
harness are
damaged or
have loose or
missing
mounting
hardware and
A/C is required
for mission.
TM 9-2320-273-10
0025
0025-50