TM-9-2320-279-10-2

M977 SERIES, 8x8 HEAVY EXPANDED MOBILITY TACTICAL TRUCKS (HEMTT)

OPERATOR’S MANUAL VOLUME 2 OF 2

DECEMBER 1998
CHANGE 3

  TM-9-2320-279-10-2 - Page 105 of 819

2-62. M984E1
TM 9-2320-279-10-2
M984E1 General Operating Procedures (Cont)
NOTE
Beacon lights should remain in raised position except
for crane operations.
c.
Set Up Rear Beacon Lights.
2-70
Change 3
NOTE
Right and left beacon lights are set up in the same way.
(1)
Remove two nuts (1), lockwashers (2), washers (3), and screws (4)
from support bracket (5).
CAUTION
Do not let beacon drop when raising to operating
position. Damage to beacon can result.
(2)
Raise beacon support tube (6) until lower set of holes in beacon
support tube aline with holes in support bracket (5).
(3)
Install two screws (4) through holes in support bracket (5) and beacon
support tube (6).
(4)
Install two washers (3), lockwashers (2), and nuts (1).


Back to Top