TM-9-2320-279-20-2

M977 SERIES, 8x8 HEAVY EXPANDED MOBILITY TACTICAL TRUCKS (HEMTT)

TECHNICAL MANUAL; MAINTENANCE INSTRUCTIONS; ORGANIZATIONAL MAINTENANCE, VOLUME 2 OF 3

  TM-9-2320-279-20-2 - Page 425 of 938

TM 9-2320-279-20-2
Frame and Tire Carrier Maintenance Instructions (Cont)
14-17. TIRE CARRIER DECKING AND BRACKETS ASSEMBLY
REMOVAL/INSTALLATION (M983) (CONT).
a.
Removal.
(1)
Remove lever nut (1) and holddown plate (2).
NOTE
If trailer spare tire is in place remove trailer spare tire.
(2)
Using suitable lifting device, support decking assembly (3).
(3)
Remove 16 nuts (4) and screws (5).
(4)
Soldier A removes and guides decking assembly (3) while Soldier B operates lifting device.
14-38
Change 2


Back to Top