TM-9-2320-279-20-2

M977 SERIES, 8x8 HEAVY EXPANDED MOBILITY TACTICAL TRUCKS (HEMTT)

TECHNICAL MANUAL; MAINTENANCE INSTRUCTIONS; ORGANIZATIONAL MAINTENANCE, VOLUME 2 OF 3

  TM-9-2320-279-20-2 - Page 427 of 938

TM 9-2320-279-20-2
Frame and Tire Carrier Maintenance Instructions (Cont)
14-17.
TIRE CARRIER DECKING AND BRACKETS ASSEMBLY
REMOVAL/INSTALLATION (M983) (CONT).
(3)
Soldier A guides and positions decking assembly (8) while Soldier B operates lifting device.
(4)
Install 16 screws (9) and nuts (10).
(5)
Tighten nuts (7) and remove lifting device.
NOTE
If trailer spare tire was removed, install trailer spare tire.
(6)
Install holddown plate (11) and lever nut (12).
c.
Follow-on Maintenance.
(1)
Install stowage box (para 16-35).
(2)
Install slave cable hooks (para 16-70).
(3)
Install ladder (TM 9-2320-279-10).
END OF TASK
14-40
Change 2


Back to Top