TM-9-2320-279-20-2

M977 SERIES, 8x8 HEAVY EXPANDED MOBILITY TACTICAL TRUCKS (HEMTT)

TECHNICAL MANUAL; MAINTENANCE INSTRUCTIONS; ORGANIZATIONAL MAINTENANCE, VOLUME 2 OF 3

  TM-9-2320-279-20-2 - Page 432 of 938

TM 9-2320-279-20-2
Frame and Tire Carrier Maintenance Instructions (Cont)
14-18. TIRE DAVIT WINCH AND CABLE REMOVAL/REPAIR/iNSTALLATION (CONT).
(1)
(2)
(3)
(4)
(5)
(6)
c. Assembly.
Install ratchet spring (1), spacer (2),
pawl (3), washer (4), screw (5), and
locknut (6) on winch base (7).
Install bushing (8) and drive shaft (9) in winch base (7). Push drive shaft in bushing until it stops.
Install pressure plate (10), ratchet wheel (11), pressure washer (12), and bushing (13).
Position drive shaft (9) in bushing (13) and install retaining ring (14).
Install and rotate handle (15) clockwise.
Install handle spring (16) and handle locknut (17).
14-45


Back to Top